jump to navigation

YEMEN : 400 MW MABAR GAS TURBINE POWER STATION January 17, 2009

Posted by worldb2b in New Plants, Tenders.
Tags: ,
add a comment

Sana , YemenInvitation to Prequalify Companies for Designing, Engineering, Manufacturing, Installing, Training, Start-up and Commissioning of 400 MW MABAR GAS TURBINE POWER STATION.
Invitation are due to sent out to qualified companies to submit their bids by 13th of April 2009.
The pre-qualification will be processed in accordance with the instructions provided in a Prequalification Document. The invitation is open to all companies from countries specified in the prequalification.
For more information on the Prequalification Document, please contact the address shown below during working hours (8:00 AM to 3:00 PM).
Applicants interested in purchasing the Prequalification Document are requested to submit their written application request to the address shown below, and enclose with their application a non-refundable amount of $200. The application should be sent in a sealed and stamped envelope to the address shown below. Applications should be received by 11th March 2009.
The qualified companies for Marib Gas Power Plant Project (Phase II) 400 MW should not submit their applications but the letter of interest is required.
The Prequalification Document will be put out on the following websites:
The PEC website (www.pec.com.ye). Then log on to Bids and advertisement.
The official website can also be accessed through the service provider (y.net).

CONTACTS:

Ministry of Electricity & Energy
Public Electricity Corporation
MABAR GAS TURBINE POWER STATION
P.O.BOX 178
AIRPORT ST. NEAR ALTHAWRA PARK
SANA´A REPUBLIC OF YEMEN
ATT. PEC MANAGING DIRECTOR
TEL. 00967 1 328 141/2/3/4 FAX 00967 1 328 150/1
E-MAIL: YPECNT@Y.NET.YE

Engineering, Procurement, Contruction & Commissioning of 300MW Kimanis Power Project January 15, 2009

Posted by worldb2b in New Plants, Tenders.
Tags: ,
add a comment

petronas-towers-1PETRONAS Gas Behad (PGB) and Yayasan Sabah (YS) intend to construct a combined cycle power plant with a nominal generating capacity of 300MW in Kimanis, District of Papar, Sabah through a proposed joint-venture company, soon to be incorporated between PGB and YS.
PGB and YS hereby invite applications from prospective bidders with relevant experience, financial capability and resources to qualify for the tender as indicated in the Pre-Qualification Document.
The prospective bidders or consortium/joint venture company must have previous working experience with an Original Equipment Manufacturer (OEM), proven capability, relevant experience and successfully completed the implementation of a similar combined cycle power plant project. Foreign bidders are required to form a joint-venture or consortium with capable local contractors to maximize local participation.
The Pre-Qualification Document will be available for purchase and collection from 13 – 23 January 2009 at Group Supply Chain Management Division, Level 9, Tower 1, PETRONAS Twin Towers, Kuala Lumpur City Centre, 50088 Kuala Lumpur during following working hours:
Monday – Thursday (9.30am – 12.30pm & 2.30pm – 4.30pm)
Friday – (9.30am – 12.00pm & 3.00pm – 4.30pm)
The document fee of RM10,000 (non-refundable) should be made by Bank Draft to Petronas Gas Berhad upon collection of the document. In the case of joint-venture, the document should be purchased by the lead partner. A copy of receipt/acknowledgement must be submit together with the application for Pre-Qualification to Tender Box 9, Kimanis Power Project (KPP), Level 9, Tower 1, PETRONAS Twin Towers, Kuala Lumpur City Centre, 50088 Kuala Lumpur.
Pre-Qualification closing date will be on 16th February 2009 at 12.00noon. All costs incurred in relation to the application for pre-qualification shall be borne by the applicant.